Home >

Simple Contract Model

2010/5/25 18:01:00 112

A simple model of contract contract -- the model of processing contract.


Contract No: No.


The designated person: the place of signature, the location of the contract, the location of the contract, the following points:


The Contractor: the time of signing the contract.


Article 1. Fixed crop, quantity, remuneration and delivery deadline


It is very popular.


Fixed crop name, specification, type, unit of measurement, quantity, remuneration, delivery date and quantity.


Unit price sum


The total amount of Renminbi (capital): (Note: space is not enough, can be connected).


It is very popular.


Second materials provided by the contractor


Name of serial number, trademark, trademark, type, manufacturer, unit of measurement, quantity of material, quality, unit price and amount.


(Note: if space is not enough, you can pick up another).


Third criteria, methods, time and time for objection to the materials provided by the contractor to the Forwarders:


It is very popular in the world.


Fourth, the technical standard and quality requirements of the fixed crops are: the following are the technical standards and the quality requirements for the crops.


It is very popular in the world.


Fifth terms and conditions for the responsibility of the contractor to determine the quality of crops.


It is very popular.


Sixth, the time, method and confidentiality requirements of technical documents, drawings and samples, process requirements and so on:


It is very popular in the world.


It is very popular in the world.


Article seventh if the contractor finds that the drawings and technical requirements provided by the ordering party are unreasonable, he shall make a written objection to the ordering party within days.

The ordering party shall reply within days after receiving written objection.


The packaging requirements of eighth fixed crops and the cost burden.


It is a matter of fact.


The ninth parties (yes / no) allow third people to complete the main work of determining crops.


 
  

The tenth way and place for the delivery of fixed crops are: the first and the second.


It is very popular.


The eleventh set of standards, methods, locations and time limits for crop determination: the following are: 1.


It is very popular in the world.


The twelfth prefix will prepay the material (capital) to the Contractor before the month of the month.


The thirteenth terms of payment and material cost are: the settlement and the time limit.


It is very popular.


The fourteenth parties will pay the deposit (capital) in the year of the month of the year.


Fifteenth conditions for rescission of this contract are: 1.


It is very popular in the world.


If the Sixteenth Party fails to pay the remuneration or material fee to the contractor, the contractor (or / or) can detain the fixed crop.


The seventeenth liability for breach of contract is: liability for breach of contract.


It is very popular in the world.


The eighteenth way to settle disputes in a contract: the dispute arising from the execution of this contract shall be settled through consultation between the two parties. It can also be mediated by the local administrative department for Industry and commerce.


(1) to submit arbitration to the Arbitration Commission;


(two) bring a lawsuit to the people's court according to law.


The nineteenth other items are: 1.


It is very popular in the world.


The opinion of the Contractor's contractor (public) card:


The contractor (Chapter): the contractor (Chapter):


Residence: Residence:


Legal representative: legal representative:


Identity card number: ID card number:


Principal agent: principal agent:


Tel: Telephone:


Bank of opening: Bank: Certificate (public) Certificate Authority (Chapter)


Zip code: zip code: year, month and date


Supervision department: printing unit:


Key points of document


 

A fixed contract is a contract whereby the contractor processes the fixed crops and pays the remuneration according to the requirements of the ordering party.

The difference between a fixed contract and a processing contract is that the processing contract is the supply of raw materials by the ordering party, and the contractor is responsible for processing the fixed crops. The contract is for the contractor to make use of his own technology, manpower and raw materials to complete the specific crops' addition according to the requirements of the ordering party.

The requirements of the ordering party usually appear in the form of drawings, technical conditions or samples.

This format is the model text (GF - 2000 - 0302).


The main contents of the contract include: the name, quantity, remuneration and delivery time of the designated crops; the basic conditions of the name, brand, trademark, specification, type, manufacturer, unit of measurement, quantity, unit price and amount of the raw materials provided by the contractor; the acceptance and objection of the designated person to the timber; the technical standard and quality requirement of the fixed crop; and the time for the blueprint to provide the drawings, samples and process requirements.


hot tip


(1) the quality and quantity of materials provided by the contractor and the acceptance of the contractor should be clearly defined.

As to what materials and materials to be used, the contractor should provide detailed list to the ordering party before he agrees with the consent of the ordering party.

In the contract, the content of the acceptance material should be clearly determined, and the material quality of the material is disagreed. The ordering party shall submit it within the prescribed time limit.


 

(2) the remuneration of a fixed contract is higher than that of a processing contract.

Because the materials provided by the Contractor shall include the price of the material.

Therefore, both sides should agree on the price of the materials and write them into the contract to prevent disputes arising from the price of the materials.


(3) the ordering party shall provide technical data and processing drawings, etc., and stipulate the time and quality contract provided.

If the drawings and technical data provided by the ordering party are unreasonable, the contract should specify the time for the contractor to raise objections and the contents of the amendment.


(4) the delivery and acceptance of fixed crops are the same as processing contracts.

  • Related reading

设备技术协议范本

Contract template
|
2010/5/22 16:51:00
122

About Technology Stock Contract Model

Contract template
|
2010/5/22 16:49:00
151

Contract Model For Garment Hair Processing

Contract template
|
2010/5/21 18:19:00
95

Mortgage Loan Contract Template

Contract template
|
2010/5/20 18:30:00
37

How To Deal With Collective Contract Disputes?

Contract template
|
2010/5/19 15:44:00
36
Read the next article

Garment Processing Contract

Party A (Supplier): the contract number is: the contract number is: the contract code is: the contract number is: the first party, the processing area, the contract location is: the first place of the contract is the following: